Leachate Treatment Project In Jinan
Construction time: June 2017
Capacity and process: 400t/d; pretreatment (coagulation flocculation + dissolved air flotation) + two-stage DTRO (90bar) + concentrated liquid reduction treatment
Tail water discharge standard: Standard set out in Table 3 in Standard for Pollution Control on the Landfill Site of Municipal Solid Waste (GB16889-2008)
Project features: The chloride ion, conductivity, and pollutant concentration in the leachate are all above those stipulated in the conventional leachate indicators, and the quality of tail water is high.